SOLAR EQUIPMENT LABELLING
Leave the labelling burden of your solar projects to our engineers
Free engineering review
REQUEST FORMSend us your single-line diagram and layout plan, and we will prepare a label set compliant with TEDAŞ, Ministry of Energy and occupational safety requirements. You approve it; flawless production arrives at your site.
- Sector engineering expertise
- Zero-error commitment
- Industrial-grade quality
Confidentiality guarantee: The layout plan, single-line diagram and all technical documents you share through our platform are protected under the gesetiket.com commitment. Shared technical data is never disclosed to any third party, institution or organisation.
Message us on WhatsAppWhy gesetiket.com?
Sector engineering expertise
We do not merely print. We know the technical language of the project and the TEDAŞ and ministry acceptance processes. We reduce the risk of your plant failing acceptance over missing labels to zero.
Zero-error commitment
Your single-line diagram and general layout plan are reviewed by our engineering team before production. Missing string numbers and incorrect naming are caught beforehand.
Industrial-grade quality
We do not use ordinary foils for systems that must survive 25 years under the sun. We choose materials with the highest resistance to outdoor conditions, heat and UV radiation.
- 50+
- Completed projects
- 100MWp+
- Installed capacity labelled
- No plant has failed acceptance over a missing label
How the labelling process works

- 1
Send us your project
Share your details through the form or WhatsApp so we can begin the engineering review.
- 2
Digital proof and approval
Review and approve the per-type quantity summary along with sample designs.
- 3
Sorted delivery
Receive your labels packed per inverter, organised to speed up installation on site.
Our product groups
High-quality, standards-compliant industrial solutions for every point of your plant.



DC group labels
Everything on the panel side, from string labels to inverter nameplates. Cable-wrap string labels, daylight voltage warnings and inverter numbering belong to this group.


LV-MV group labels
The transformer, kiosk, MV switchgear and AC panel side. High-voltage danger signs, panel numbering and cable route warnings are collected here.


Safety and warning signs
The warning signs regulations require at site entrances and in hazardous zones: danger-of-death signs, bidirectional supply warnings, unauthorised entry prohibitions, mandatory protective equipment and fire equipment markings.
Our standard designs
A selection of the ready designs we use on site. Your project-specific coding and numbering is applied on top of these designs.
DC group labels8

DC 1000 Volt

DC 1500 Volt

PV Generator on Roof

PV Module — Shock Hazard

Inverter Number Label

Do Not Service Without Isolating From Grid

String Cable Labels

DC High Voltage During Daylight
LV-MV group labels7

AC 400 Volt

AC 800 Volt

Warning — LV/MV Cable Route

Transformer — Authorised Access Only

Warning — LV/MV Electricity

Warning — Underground Cable

Panel and Zone Nameplates
Safety and warning signs6

Danger — Risk of Death

Warning — Bidirectional Supply

Wear Protective Equipment

Fire Extinguisher

Authorised Personnel Only · Bidirectional Supply

Authorised Personnel Only
Who it is for
We come in at four distinct moments in a plant's life.
- 01DESIGN
Electrical design offices
To procure on a client's behalf and add it to your own deliverable.
- 02BUILD & ACCEPTANCE
EPC and contracting firms
To have labels made before provisional acceptance and to close any missing ones quickly.
- 03AUDIT & HANDOVER
Solar plant owners
For audits, insurance and documentation ahead of a transfer.
- 04OPERATION
O&M providers
To replace labels that have worn out or become illegible.
Frequently asked questions
If your question is not answered here, write to us directly and our engineer will review your project.
Contact channelsWhich files do I need to send?
The single-line diagram and the general layout plan in .dwg format are enough. If anything is missing from the project, our engineer will get back to you.
Are my technical documents safe?
The files you share are never disclosed to third parties, only the engineer assigned to your project can access them, and source files are destroyed after delivery.
How is the price determined?
The price depends on the size of the plant and the number of labels, which is why we do not publish a price list. We prepare a tailored quote after reviewing your project.
How long does delivery take?
It depends on the size of the plant and the current production load. Rather than quoting a general range, we inform you specifically after reviewing your project.
Do you work with small plants too?
Yes. We work at every scale, from rooftop installations under 25 kW to megawatt-scale ground-mounted plants.
Reach us directly
If you would rather not send files, or want to ask something first, use any of the channels below.
Confidentiality guarantee. The layout plan, single-line diagram and all technical documents you share through our platform are protected under the gesetiket.com commitment. Shared technical data is never disclosed to any third party, institution or organisation.
Send a review request
